2010 STUDY
Concept Completion and Cost Evaluation – October
2010
Since the Preliminary Concept Design presentation in
October, 2009, the SCC has continued studying the use of the site at the
Outdoor Pool and prepared a cost estimate of the total costs to realize the Concept
Design. In addition, the SCC prepared a
financial projection of the facility. The
following is the final report in four parts:
· Part 1 -
Concept Design.
o Click here to see a PDF copy of the Concept Design & Code Review
· Part 2 –
Site & Infrastructure Study
o Click here to see a PDF copy of the Site Infrastructure Analysis,
Geo-Technical Report, Flow Test Data, and related Site drawings.
· Part 3 –
Cost Estimate
o Click here to see a PDF copy of the Concept Model Cost and the Detailed Cost Estimate
· Part 4 – SCC
Financial Projections
o Click here to see a PDF copy of the SCC Financial Projections
|